Fire Protection for Leading Distribution Centre Fire Protection for Leading Distribution Centre 2Fire Protection for Leading Distribution Centre 3

Our responsibilities: Waterson Projects were selected to provide fire protection requirements to a leading warehouse distribution centre

Project Outline: To supply and install fire protected stair enclosures to provide access to new mezzanine floor created (mezzanine floor supplied and installed by others).We also installed 5000m2 of fire rated promatect 250 MF ceiling system 

Location: Milton Keynes

Duration: 6 months

Back to Case Studies