Fire protection for large storage space
Project Outline: Supply extra storage space for customer to 1000m2 fire protection 6m high.
Our responsibilities: Supplied 60 minute fire protection to mezzanine floor (mezzanine supplied by others) by installing column cases, fire resistant fascia and suspended ceiling to encase the structure.
In the event of a fire this system gives a reasonable time to escape and protects fire fighters from premature collapse of the floor, as requested in most cases by building control.
Duration: 4 weeks