![Peterborough](/resize-width/200/peterborough0_0img-9091--2-.jpg)
![Peterborough 2](/resize-width/200/peterborough0_0img-0468--2-.jpg)
![Peterborough 3](/resize-width/200/peterborough0_0img-4096--2-.jpg)
Our responsibilities: Waterson Projects were selected to create 2 No stair enclosures for a leading online retailers distribution depot
Project Outline: To supply and install 2 No fire rated stair enclosures to provide access to new mezzanine floor created (mezzanine floor supplied and installed by others). Enclosure was built using a fire rated steel faced panel system.
Location: Peterborough
Duration: 1 month
Back to Case Studies